Fenékpuszta Castrum

Excavations 2009-2017

Excavations 2009-2017

The new archaeological excavations, which began in 2009, primarily aimed to investigate building structures that were only partially known from earlier investigations in the early 20th century. The excavations focused on three areas: 1) a horreum (= granary, Building 4) south of the north gate; 2) two buildings in the south-east corner of the complex (Buildings 24 and 27). Both date to the 4th and early 5th centuries. 3) Finally, a building complex (Building 25) north of Buildings 24 and 27, which had been redesigned several times, was investigated. This is a building with a peristyle. This so-called main building played a central role both in terms of settlement before the fortress was built (end of the 3rd century) and in terms of its subsequent use into the early Middle Ages. The results of the excavations are presented in volumes 9 and 10 of the series ‘Castellum Pannonicum Pelsonense’, including results from the field of scientific analysis (archaeobotany, archaeozoology, petrography, lead isotope analysis, radiocarbon analysis).

Excavation leaders: Orsolya Heinrich-Tamáska (GWZO), Roland Prien (Ruprecht-Karls-Universität Heidelberg), Péter Straub (Göcseji Múzeum, Zalaegerszeg)

Cooperation partners: GWZO Leipzig, Ruprecht-Karls-Universität Heidelberg, Göcseji Museum Zalaegerszeg, Balatoni Museum Keszthely

Excavation funded by: NKA (Nemzeti Kulturális Alap), the City of Keszthely, Zala County, Ruprecht-Karls-Universität Heidelberg, GWZO Leipzig

News about the excavations

2009

2011

2013

2014

2015

2017